DN108-P02 — Roads & Infrastructure in North of Al Nassriya Package 02 Main Infrastructure


  • Client Public Works Authority
  • Date Started 20 August 2017
  • PMC Parsons Brinckerhoff (PB)
  • Contractor BOOM Const. Co. & LOTUS Trading & Cont. Co. Joint Venture (BLJV)
  • Status Maintenance Period - Waiting FCC
  • Comp. Date: 15th April 2021
  • GEC Hyder Consulting Middle East Ltd.
  • Contract Value QAR. 285,000,000/-

PROJECT SUMMARY

The Project is under PWA Framework Construction Contract for LRDP Work Order No. DN108-P2, and this was constructed/delivered through a Joint Venture between Boom & Lotus (BLJV).

The scope of DN108 Package 2 was to carry out grading works and provide temporary roads, foul sewer, surface water, street lighting, electricity, potable water, and telecommunication road crossing ducts within the carriageway.

Lotus was responsible for the drainage works and Surface water works along with all Microtunnelling works in the project.