Lotus Trading & Contracting Co. W.L.L.
Infrastructure Status: Completed Ref: C850/1

Construction of Flood Prevention Scheme (Phase 3) Doha North - C850/1 (Sub-contract Works)

Construction of Flood Prevention Scheme (Phase 3) Doha North - C850/1 (Sub-contract Works)
Client / Employer

Public Works Authority

Status

Completed

Date Started

January 1, 2022

Consultant

Parsons International

Contract Value

QAR 15.24 Million

Project Scope & Specifications

The sub-contract works include, but are not limited to the following:

• General Requirements for Sub-contract works
• Surface Water works
• Surface Water pipeline length – 3,717 LM
• Surface Water Manhole – 55 Nos.
• Gully pipeline length – 3,165 LM
• Gully pot – 157 Nos.

Project Site Photography

Construction of Flood Prevention Scheme (Phase 3) Doha North - C850/1 (Sub-contract Works)
Construction of Flood Prevention Scheme (Phase 3) Doha North - C850/1 (Sub-contract Works)
Construction of Flood Prevention Scheme (Phase 3) Doha North - C850/1 (Sub-contract Works)
Construction of Flood Prevention Scheme (Phase 3) Doha North - C850/1 (Sub-contract Works)
Construction of Flood Prevention Scheme (Phase 3) Doha North - C850/1 (Sub-contract Works)
Construction of Flood Prevention Scheme (Phase 3) Doha North - C850/1 (Sub-contract Works)
Construction of Flood Prevention Scheme (Phase 3) Doha North - C850/1 (Sub-contract Works)

Related Projects