Infrastructure
Status: Completed
Ref: C850/1
Construction of Flood Prevention Scheme (Phase 3) Doha North - C850/1 (Sub-contract Works)
Client / Employer
Public Works Authority
Status
Completed
Date Started
January 1, 2022
Consultant
Parsons International
Contract Value
QAR 15.24 Million
Project Scope & Specifications
The sub-contract works include, but are not limited to the following:
• General Requirements for Sub-contract works
• Surface Water works
• Surface Water pipeline length – 3,717 LM
• Surface Water Manhole – 55 Nos.
• Gully pipeline length – 3,165 LM
• Gully pot – 157 Nos.