The project consists of the completion of remaining works of the permanent and temporary infrastructure of the DW077-P01 project – Roads and Infrastructure in Rawdat Egdaim and Ezghawa Package 1 including, not limited to road works, street lighting, surface water drainage, foul water drainage, electricity, potable water and
telecommunication crossing ducts. The project area covers approximately 151 hectares in two residential subdivisions.